X3 Data Logger Buoy-Based Installation
All X3 Data Loggers ship with multiple mounting equipment sets compatible with NexSens CB-Series data buoys. One set provides mounting equipment for the smaller buoy ranges (CB-150 to CB-450), and the other is used for the larger buoy ranges (CB-650 to CB-1250).
Engravings next to the antenna ports display the antenna type (i.e., CELL or SAT). For proper communication, match the appropriate antenna with the corresponding engraved antenna port. To avoid damage, remove all antennas before installation. Programming and testing the system before installation and labeling the ports with the sensor locations are also recommended. Once that is complete, follow the installation processes below for the specific buoy model.
Small Buoy Mounting Instructions (CB-150 to CB-450)
Included equipment:
| Required Tools:
|
- Gather the CB-150-450 Mounting equipment. Use a 9/16″ socket or wrench to remove the white top plate from the buoy’s solar tower.
- Align the threaded slots on top of the logger with the (4) corresponding holes on the white plate.
- Attach the logger using the (4) hex head cap screws, lock washers, and flat washers.
- Tighten using a 1/2″ socket or wrench.
- Provide power to the middle 6-pin port on the data logger via the solar tower plug and connect the sensors to the outer 8-pin ports.
- Ensure the sensors are connected in the same configuration as they were programmed.
- Reattach the plate and install the antenna.
- Install the antenna to the correctly labeled port (i.e., CELL or SAT).
Large Buoy Mounting Instructions (CB-650 to CB-1250)
Included equipment:
| Required Tools:
|
- Gather the CB-650-1250 Mounting equipment. Align the threaded inserts on the bottom of the data logger with the (3) black isolation washers and the smaller holes on the mount.
- The data logger ports should align with the large openings on the mount.
- Note: An intentional gap will exist between the mount and the data logger to avoid contact between the dissimilar metals.
- Insert the (3) hex head cap screws, lock washers, and flat washers into the threaded inserts on the logger.
- Tighten using a 9/16″ socket or wrench.
- Provide power to the middle 6-pin port on the data logger and connect the sensors to the outer 8-pin ports.
- Ensure the sensors are connected in the same configuration as they were programmed.
- For any connectors within or below the solar tower, it is best to tie a rope or string around each connector to pull them through the opening at the top of the solar tower.
- Install the antenna to the correctly labeled port (i.e., CELL or SAT).
- Ensure the cellular antenna’s O-ring is seated correctly and the antenna is making solid contact with it.